Current location:
Home
> Solution > Advertising Machine Digital Signage Solution
Release date: 2026-10-22
Clicks:0
Provide media operators and system integrators with 43-98 inch outdoor wall-mounted advertising machines and 32-98 inch outdoor vertical integrated machines, which are selected by point, verified by model and delivered by project.
Real shot of bus station pavilions and street pointsThe difficulties of outdoor projects focus on four things: strong light readable, year-round environmental tolerance, point-to-point installation structure, and multi-point remote operation and maintenance.
Noon direct, reflective glass, polarized sunglasses, will affect the readability of the picture.
High temperature, low temperature, coastal salt fog, rain and snow and sand and dust need to be configured accordingly.
The wall bearing, station pavilion opening, foundation fixing and maintenance space shall be confirmed before installation.
The versatility of equipment online, fault alarm, offline playback and spare parts determines the efficiency of operation and maintenance.
Bus station kiosk point
STREET FACILITIESFirst select the equipment according to the point shape, and then confirm the model according to the size segment and common specifications, so as to avoid taking "maximum size" as the default recommendation.
| Point type | Recommended Form | Key dimension section | Item must be confirmed |
|---|---|---|---|
| Building Facade Street Point | Outdoor wall hanging advertising machine | 43-65/75-86 inches | Wall load-bearing, support, maintenance space and routing |
| Bus Station Kiosk Lightbox Replacement | Wall mount/kiosk integration, single-sided or double-sided | 55-65 / 75-86 inches | Original light box size, opening, weight, ventilation, glass and door body |
| Independent point of sidewalk | Outdoor vertical all-in-one machine | 43-65/75-86 inches | Foundation fixation, wind resistance, anti-dumping, passing space, incoming line |
| Multi-site batch transformation | Unified configuration by point classification | Common specifications are preferred | Consistent appearance, common installation interface and spare parts |
Outdoor wall hanging advertising machine
Outdoor vertical all-in-one machine
Bus stop light box replacement
43-98 inch available/customizable range; common available specifications, mounting interfaces and size segments are recommended in the selection manual.
Parameters such as brightness, working temperature, IP, IK, etc. are marked according to specific models and are not generalized; each requirement has a verification method and evidence.
Highlight Rizhao Readable
optical bonding
Ambient light automatic dimming
| Heat dissipation route | Applicable climate/load | Noise | Maintenance | Project Notes |
|---|---|---|---|---|
| Natural heat dissipation | Mild climate, low power consumption, small size point | None | low | Installation space and ventilation path to be ensured |
| Air-cooled | Conventional high temperature, medium and high brightness long time operation | There is | Regular cleaning of the filter | Cost controllable, need to design dust filter |
| Heat exchange | High temperature and dusty, internal and external air to be isolated | low | middle | Suitable for bus station kiosks and other street facilities |
| Air conditioning cooling | Extreme high temperature, bright high load continuous operation | There is | Higher | Power consumption, drainage and maintenance conditions to be assessed |
Air-cooled cooling
Heat exchange
low temperature heating
IP65 complete machine protection
Anti-vandal glass
Lightning Surge
The front opening or rear opening mode is determined according to the point position and installation space.
Perform and record status per Maintenance Manual cycle.
Fan, power supply and other modules support field replacement.
Remote confirmation of temperature, online and playback status.
Front opening maintenance structure
Installation of bus station kiosk
High and low temperature test
Rain protection testWhat is really stuck in the bus station project is the responsibility boundary of structure, opening, power supply and whole station certification, not just "changing a screen".
Inner frame, outer frame, opening, depth, weight, door body, glass, ventilation.
Who shall provide the opening diagram, structure diagram and electrical wiring diagram.
The station pavilion factory is responsible for the whole station structure, and the screen supplier provides the interface and load.
Mains access, leakage protection, grounding, timing switch, lightning protection by whom construction.
Screen body certification and station kiosk whole station certification are listed separately.
| Matter | Screen Supplier | Kiosk Manufacturer | Integrator/Constructor |
|---|---|---|---|
| Screen specifications and certification | Responsible for | Cooperation | Confirm |
| Opening drawing/structure interface | Provide screen body interface | Responsible for the whole station structure | Coordinated construction |
| Mains access and grounding | Provide electrical requirements | Reserved in station kiosk | On-site construction |
| Full station certification | Provide screen file | Responsible for the whole station | Coordination |
Interface diagram of station kiosk structure
Off-grid/solar power supply point
The bus arrival information is an independent system, and the data interface and authorization shall be confirmed, and it shall not be confused with advertisement broadcasting. The city's restrictions on size, brightness and night light pollution shall be confirmed according to local regulations.
Can manage multiple sites, but do not exaggerate the effect data; Play logs, online status and exposure conversion are different levels of things.
Multipoint CMS Release
Offline Play and Network StrategyWrite the delivery process as a list of information that integrators can take to bid and install, not just "ship-install-after-sales".
Country, point photo, quantity, power supply network, CMS.
Point classification configuration, installation interface, responsibility boundary.
Sunshine display, installation and maintenance, software compatibility.
Freeze configuration, number label, factory inspection, packaging and transportation.
Debugging, training, inspection and cleaning division.
Remote troubleshooting, spare parts, warranty and SLA instructions.
Project Delivery Process
Packaging and Shipping
Project data package list: specifications, CAD/opening drawings, electrical wiring diagrams, installation manuals, maintenance manuals, certification lists, prototype policies, packaging and transportation instructions.
From size and shape to installation structure, motherboard interface, CMS adaptation and climate protection, communicate and customize direction according to project requirements.
Communicate size segments, single-sided/double-sided and profile structures according to point requirements.
Wall bracket, vertical foundation, access door and routing structure.
Interface communication, system adaptation and customer-owned CMS docking.
According to the target market climate configuration protection, temperature control and anti-damage program.
Factory production and quality control
Bulk delivery and packaging
Partner Links: