Service Hotline:

+8615920011166

en en

Interactive Flat Panel

Current location: Home > News > Product News > Interactive Flat Panel

Interactive Whiteboard Installation Guide: Wall, Power, Network, and Ventilation

Release date: 2026-10-10 Clicks:0

From load-bearing and support, power supply preparation to screen projection network and heat dissipation space, the Qtenboard analyzes how to help schools, enterprises and system integrators do a good job of pre-installation survey and acceptance with 20 years of manufacturing experience, fanless design and MT9679/RK3588 multi-platform chip configuration.

October 2026Qtenboard Installation GuideRead for about 16 minutes.

The fact that the equipment can be put down does not mean that the site is suitable for installation. Installation problems often start outside the device. The screen size meets the requirements, but the site wall structure is unclear. The socket is hidden and difficult to access or maintain after installation. The device can access the Internet, but the wireless screen is not available in the enterprise network. In order to be beautiful, the equipment is embedded in the cabinet, but there is no space for heat dissipation and maintenance according to the product requirements.

At the same time, before installation, it should be confirmed that "it is fixed safely, the power supply matches, the network can complete the task, and the heat can be dissipated". These four conditions need to be entered into the survey table and project quotation, rather than temporarily processed after arrival.

Qtenboard (Shenzhen Qunmao)Founded in 2005, we have been dedicated to interactive display manufacturing for 20 years. We operate a 330,000㎡ smart manufacturing industrial park in Shenzhen and Guangzhou, comprising 16 factory buildings and 8 fully automated production lines, with a daily output capacity of 200 units, serving customers in 120 countries and regions worldwide. The Qtenboard interactive whiteboard covers 55-110 inch full-size segments, adopts fanless interactive flat panel design, supports MT9679/RK3588 multi-platform chip configuration, and is equipped with Q AI system-level framework and DMS equipment management system, providing a complete scheme from factory configuration to on-site engineering connection for education, conference and OEM/ODM projects.

At the same time, before installation, it should be confirmed that "it is fixed safely, the power supply matches, the network can complete the task, and the heat can be dissipated". These four conditions need to be entered into the survey table and project quotation, rather than temporarily processed after arrival.

Full text statement: The following is a procurement and project management framework and does not replace model-specific installation manuals. Wall fixing, electrical construction and load-bearing judgment should be completed by professionals with corresponding capabilities.

1. Collect equipment and site data first

No specific model and installation data, should not directly determine the construction plan

1. Request from suppliers

  • Overall machine model, overall dimensions and weight
  • Requirements for Hanging Hole and Adaptable Bracket
  • Installation Manual of Corresponding Model
  • Power input, power consumption and use environment requirements
  • Interface location and cable connection instructions
  • Ventilation, installation direction and maintenance requirements
  • OPS, camera and other optional accessories

How Qtenboard supports:Qtenboard provide the size, weight, hole location and installation data of the corresponding model. The MT9679 platform is suitable for education and standard conference rooms, and the power consumption is optimized; the RK3588 platform is suitable for high-end conferences and 8K applications, and the power consumption is relatively high. Fanless design reduces heat dissipation space requirements.

2. Confirm with the person in charge on site

  • Wall material and structure information
  • Room layout, doors, windows and viewing locations
  • Power and Network Access Location
  • Handling route and installation conditions
  • Whether decoration, cabinet or sliding blackboard is involved
  • Responsible person for site construction and acceptance

2. wall and bracket: first confirm the load bearing, then discuss the installation height

Wall decoration materials can not replace the wall structure judgment

The manufacturer's installation instructions require the wall to be able to support the weight of the display equipment and hanging components; when the wall structure is unknown, it is a modular partition, etc., engineering evaluation may be required.

1. Key points of wall verification

  • Whether the wall structure is clear
  • Whether the installation location has a suitable fixed foundation
  • Whether reinforcement is required or a different installation scheme is used
  • Whether the state of wall surface meets the requirements for installation
  • Whether there is a hidden pipeline at the drilling position needs to be checked in advance.

2. Stent verification focus

  • Whether it is suitable for the size, weight and hole location of the specific model
  • Whether to consider the weight of additional equipment
  • Whether it meets the manufacturer's requirements
  • Are the installed interfaces, vents and access locations accessible

3. Installation position and height

It is recommended to discuss with the following conditions, without giving a uniform height:

  • Scope of action for instructors, students, or conference users
  • Farthest viewing position and common content font size
  • Whether the podium, tables and chairs and other equipment are blocked
  • Side operation and maintenance space
  • Room light and reflection

4. Move the bracket as an alternative

  • Bearing and model adaptation
  • Stability and caster locking
  • Moving route and doorway space
  • Cable storage and moving process

How Qtenboard supports:The Qtenboard provides wall mount and mobile bracket solutions to support 55-110 inch full size segments. The weight of the equipment is different due to the size and configuration, and the specific load-bearing parameters are subject to the model manual.

3. power supply: matching equipment requirements, but also to facilitate maintenance

Power ready isn't just "there's a socket nearby"

The manufacturer's installation data emphasizes that the power socket should be located near the equipment and kept accessible during use; specific power supply requirements still need to check the corresponding model and local conditions.

1. Key points of power supply verification

  • Equipment nameplate and manual input requirements
  • Whether the field power supply, plug and socket match
  • Earthing and protection configuration shall be verified by professionals
  • Power demand of the whole machine, OPS and peripherals
  • Whether power supply position is convenient for power off and maintenance
  • Whether new lines or socket modification are involved

2. Wiring and maintenance

  • Whether the power cord is squeezed or pulled
  • Whether it can be checked and replaced after installation
  • Whether it obstructs the traffic or moves the support
  • Whether the power supply and other connections are clearly marked

3. Procurement boundary of power supply scheme

If the project proposes UPS, surge protection or centralized power management, the objectives and configuration should be described separately and not as a default option for all interactive whiteboard projects.

How Qtenboard supports:The MT9679 platform is specially designed for commercial interactive tablets, with 8-10 hours of stable operation of commercial loads and optimized power consumption. The RK3588 platform is suitable for high-end conferencing and 8K applications with relatively high power consumption. Specific power input requirements are subject to the model manual.

4. networking: Internet access is not the same as being able to screen, collaborate and manage

Define network requirements by actual function, rather than just validating Wi-Fi signals

1. List the functions first

  • Browse and courseware access
  • Wireless screen mirroring
  • Video conference
  • Save or collaborate in the cloud
  • Software activation and update
  • Device Management
  • Customer platform or private server access

2. Request network requirements from suppliers

  • Wired and wireless access
  • Required services, domain names and ports
  • Device Discovery and Connection Conditions
  • Proxy, Certificate, and Certification Requirements
  • External service dependency
  • Offline available range


3. Testing in the customer network

  • Teachers, staff and visitor terminals tested separately
  • Verify Projection Connection and Exit
  • Test teleconferencing and audio and video
  • Verify management platform connection and update process
  • Record results and restrictions for different network areas

4. Division of responsibilities

  • Vendor-provided functional and network technical requirements
  • Customer IT audit access and security policies
  • Integrator completes configuration and testing within agreed limits

How Qtenboard supports:Q AI core transcription runs locally on the device and can be used without networking, reducing dependence on the public network. DMS supports private deployment options to reduce network boundary risks. Supports up to 9 devices at the same time, compatible with Windows, macOS, iOS and Android.

5. ventilation and environment: do not sacrifice heat dissipation and maintenance for aesthetics

For wall hanging, cabinet and embedded installation, check the specific model requirements.

The manufacturer's installation data requires that air circulation and ventilation be considered when choosing the hanging method; Other model data also remind to avoid air conditioning airflow directly blowing to the equipment and ensure that heat can be dissipated.

1. Key points of ventilation verification

  • Whether the air inlet and outlet are blocked by bracket, cabinet or decoration
  • Whether the space around and back meets the requirements of model manual
  • Whether OPS and other heating accessories have corresponding space
  • Whether it is possible to inspect, clean and replace the relevant parts

2. Embedded and supporting the installation of the blackboard

  • Whether the cabinet or blackboard structure affects heat dissipation
  • Whether sliding parts interfere with equipment and cables
  • Are the necessary maintenance access points provided?
  • Does the customized structure require supplier confirmation?

3. Environmental conditions

  • Temperature, humidity, and dust conditions
  • Possible water vapor or leakage
  • Illumination and reflection
  • Relative position of air conditioning air outlet and equipment

The manufacturer's information, which clearly warns to avoid using the equipment in areas with excessive dust, humidity or smoke, can be used as the basis for environmental inspection in this section.

How Qtenboard supports:The Qtenboard uses a fanless interactive flat panel design, running with zero noise, no moving parts, no maintenance cycle, greatly reducing the cooling space requirements. The fanless design reduces dust inhalation and is particularly suitable for classrooms, conference rooms and embedded installation scenarios. Class 10,000 clean rooms complete touch panel manufacturing and optical bonding, ensuring product stability in a variety of environments.

6. on-site installation, testing and acceptance process

After the four conditions are confirmed, then enter the installation and joint debugging.

Suggested process:

  1. Collect specific model information
  2. Complete site survey
  3. Confirm the wall, power, network and ventilation rectification items
  4. Clarify construction and service responsibilities
  5. Complete the installation according to the manual
  6. Complete connectivity, functionality and network testing
  7. Record the problem and rectify the retest
  8. Delivery of installation and maintenance data

Recommended Acceptance Form

Acceptance CategorySuggested confirmation contentResponsible personnel
Walls and supportsIt has been installed according to the approved scheme, and the adaptation data is complete.Installation Manager
Power supplyInput matching, maintenance can be approached, professional verification completedElectrical responsible person
NetworkThe specified function has completed testing in the customer's environment.IT/Integrator
VentilationThe installation space shall meet the requirements of the model, and there shall be no occlusion and interference.Installation/Supplier
Operation and connectionDisplay, touch control, external equipment and screen projection testProject Tester
Document deliveryDrawing, configuration, record and service contactProject Manager

How Qtenboard supports:The one-time pass rate of the whole machine is ≥ 97%, and the aging abnormality rate is <1.5. A 48-hour high-temperature aging test ensures factory stability. Support prototype testing and real document verification.

How to Connect 7. Qtenboard Projects with Site Works

The factory provides products and technical data, and the site works are clearly divided according to the contract.

The Qtenboard Open Education Program includes AV control, network switching equipment, wiring, cabinet and power management in the direction of smart classroom infrastructure integration, which can be used to introduce its system solution ideas. It is not a default that all orders include these equipment or on-site construction.

1. Overview of Qtenboard core competencies

Capability dimensionQtenboard Programme
Product dimensions55-110 inch full size section
Display4K UHD, 350–500 nits brightness optional
Touch control20-50 touch, 1.5mm accuracy, 7ms response
Chip PlatformMT9679 / RK3588 / RK3576 / V100 / A311D2
SystemAndroid 14/16 Windows OPS dual system, switching <3 seconds
AIQ AI system level framework, 166 language, local operation, 5 seconds meeting minutes
Device ManagementDMS unified management, predictive diagnosis, batch control
Screen mirroringUp to 9 devices screen at the same time
Heat dissipationFanless design, zero noise, no moving parts
OEM/ODMTier 1-4 custom layering, CKD/SKD local assembly
Manufacturing strength330,000 ㎡ industrial park, 8 fully automatic production lines, 48-hour aging test
AuthenticationCe 、 FCC 、 RoHS 、 ISO9001 、 CCC
Service120 countries, after-sales response ≤ 4 hours, free OTA for life

2. Impact of OEM/ODM layered customization on installation

  • Tier 1: Software and Firmware Customization-Start Logo, UI theme and pre-installed application without affecting hardware installation
  • Tier 2: Public mold appearance customization-- Shell color, silk screen Logo, does not affect the installation hole position
  • Tier 3: Public Mold Structure Adjustment-- The interface position, mounting hole position and bracket connection may affect the installation plan, which shall be confirmed in advance.
  • Tier 4: Private Model Development-Complete industrial design, exclusive appearance, installation plan to be confirmed with Qtenboard engineering team
  • CKD/SKD local assembly-List of parts and assembly SOP affect on-site construction

3. Delivered Project Reference

  • European Education Brand ODM Project: 500 86-inch IFPD(RK3588 Platform), gold sample confirmation completed in 4 weeks, first piece yield 98.2
  • Indonesia SKD local assembly project: 50 units, import cost reduced by about 18%, delivery cycle shortened by more than 30%

4. Division of responsibilities

  • Factory delivery of complete machine and data
  • The integrator undertakes the on-site works agreed in the contract.
  • School provides account, network and teaching requirements
  • Training, acceptance and after-sales shall be clearly divided by all parties.

Expression boundary: It is not promised that all models can be embedded installation, and "providing solutions" is not directly written as "providing wall reinforcement, electrical renovation and door-to-door installation free of charge".

8. FAQ

Can an interactive whiteboard be installed on a gypsum board or lightweight partition wall?

Gypsum board or lightweight partition walls usually require engineering evaluation. When the wall structure is unknown or belongs to the modular partition, it may need to be reinforced or replaced with mobile support. It is recommended to obtain the installation manual of the corresponding model from the supplier, and it is judged by professionals with appropriate capabilities.

Does the wall mount only need to look at the load bearing?

Not only depends on the load-bearing, but also confirms whether the bracket is suitable for the size, weight and hole position of the specific model, whether the weight of additional equipment (such as OPS and camera) is considered, and whether the interface, vent and maintenance position are accessible after installation. Wall mount and mobile stand solutions are available Qtenboard.

How should the installation height be determined?

It is suggested to comprehensively determine the operating range of teachers, students or conference users, the farthest viewing position and the font size of commonly used content, the blocking of tables and chairs on the platform, the side operation and maintenance space, and the light and reflection of the room. Qtenboard no uniform height is given, the site survey shall prevail.

Do you need to add new power lines?

It depends on the input requirements specified in the equipment nameplate and manual, the matching of the field power supply, the power demand of the whole machine/OPS and peripherals. MT9679 platform power optimization, suitable for education and standard conference room; RK3588 platform power consumption is relatively high. Verification by professional electrical personnel is recommended.

Why can the device surf the Internet but can't wireless screen?

Network requirements need to be defined according to the actual function. Wireless screen projection requires device discovery and connection conditions, proxy certificates and authentication requirements. Additional configuration may be required in an enterprise network. The Qtenboard supports up to 9 devices to screen at the same time. It is recommended to test teachers, employees and guest terminals respectively in the customer network.

Can an interactive whiteboard be embedded in a cabinet or blackboard?

Need to check the specific model requirements. Embedded installation shall consider whether the cabinet or blackboard structure affects heat dissipation, whether sliding parts interfere with equipment and cables, whether necessary access is left, and whether customized structures need to be confirmed by suppliers. Qtenboard fanless design reduces cooling space requirements, but still needs to be confirmed according to the model manual.

How much space should be reserved for ventilation and maintenance?

The requirements of the specific model manual should be checked, and uniform heat dissipation spacing or installation angle should not be applied. It is necessary to confirm whether the air inlet and outlet are blocked, whether the space around and back meet the requirements, and whether there is corresponding space for OPS and other heating accessories. Qtenboard the fanless design reduces heat dissipation requirements, basic inspection, cleaning, and maintenance space is still needed.

What is the responsibility of the vendor, integrator, and customer?

Suppliers provide functional and network technical requirements, model installation information; customer IT review access and security policies; integrators complete configuration and testing within the agreed scope. Qtenboard service 120 countries and regions, after-sales response ≤ 4 hours, the specific responsibility division is subject to the contract.

How does the power consumption of the MT9679 and RK3588 chip platforms affect power supply readiness?

MT9679 platform is specially designed for commercial interactive flat panel, 8-10 hours of stable operation of commercial load, power consumption optimization, suitable for education and standard conference rooms. The RK3588 platform is equipped with 6 TOPS NPU, supports 8K video decoding, and has relatively high power consumption, which is suitable for high-end conferences and 8K applications. Refer to the model manual for specific power input requirements.

Conclusion: The installation conditions will be pre-installed to avoid temporary transformation after arrival.

The quality of the installation comes from the matching of the equipment with the field conditions. The Purchaser shall advance the wall, power supply, network and ventilation requirements to the survey and quotation stage, and complete acceptance through construction records and test results to avoid the need for additional modifications only after arrival.

QtenboardBacked by 20 years of manufacturing experience, 330,000 ㎡ industrial park, 8 full-automatic production lines, fanless interactive flat panel design, MT9679/RK3588 multi-platform chip configuration, Q AI system-level framework (166 language, local operation, 5-second minutes) and DMS equipment management system, it is oriented to global education, conferences and OEM/ODM projects, provide 55-110 inch interactive whiteboard, 4K display, 20-50 touch, 1.5mm precision, Android Windows OPS dual system, OEM/ODM/JDM/CKD/SKD customization and batch delivery services. Serving 120 countries and regions, with after-sales response within ≤4 hours.

Qtenboard can assist customers to complete interactive whiteboard solutions from site investigation, configuration selection, prototype testing to batch delivery according to the needs of education projects, conference projects and distributor dual product lines.

If you are planning an interactive whiteboard installation or looking for an OEM/ODM manufacturing partner

Qtenboard provide 55-110 inch interactive whiteboard, MT9679/RK3588 multi-platform chip configuration, fanless interactive tablet design, Q AI system-level framework, Android Windows OPS dual system, DMS device management, CMS content management and OEM/ODM/JDM/CKD/SKD customization services.

Get a Qtenboard installation preparation guide, or book a factory tour and prototype testing.

Previous:After-sales service, training and warranty: the most overlooked "soft cost" when purchasing"

Return to list

Next article:Equipment management and remote operation and maintenance: daily maintenance after large-scale deployment