From the signal list of two types of tasks, dual-path architecture, screen number backstepping and decoding conversion, to multi-plant convergence, factory type difference, three-network isolation, budget trade-off and source factory value, the landing judgment of the splicing screen of the factory park monitoring center is given.
The most expensive mistake in the monitoring and splicing screen scheme in the factory park is not that the screen is expensive to buy, but that "the security and production kanban are stuffed into the same set of decoders. As a result, the number of video paths is not enough, the kanban is refreshed and the cross-network docking is stuck by the security review".The essential difference between the factory monitoring center and the general park security center is that it simultaneously carries two types of tasks that are completely different in nature:Security guardThe monitoring is the space (perimeter, entrance and exit, warehouse, hazardous chemicals area), take the video platform to take the stream decoding;Production and operation situationThe process (production line status, equipment OEE, plan achievement rate) is monitored, and MES/SCADA application screen acquisition is taken. The two links occupy different resources, different responsible parties, and different specifications. If they are mixed together, problems will inevitably occur on one side. The more subtle risk is "fake real-time"-frozen video and stop-watch kanban are treated as real-time status, which may lead to wrong production or safety decisions. This article is carried out in the order of "task decomposition → signal list → screen number backstepping → decoding conversion → kanban wall → multi-factory convergence → factory type difference → three-net isolation → budget trade-off → on-site investigation and acceptance". each link gives calculable formulas and judgable thresholds, and explainsLCD splicing screen China source factoryThe actual value of direct supply in non-standard bracket customization, seam size combination and long-term spare parts supply.
1. selection decision order: eight steps, first task-by-task and then capacity.
The failure of the selection of the factory monitoring center is often not because a parameter is wrong, but because the sequence of links is out of order-first buy the screen and then think about the purpose, first set the budget and then divide the tasks, first match the decoder and then list the signals. A reusable chain of judgment is:
- There are two types of tasks:Clarify the proportion of security duty and production and operation situation, and whether they share a wall.
- List of column signals:Surveillance video, production kanban, access control/vehicle, fire/security alarm, item by item, source, access method, responsible party.
- Count screens:Draw a draft window layout, use "window number ÷ split number" to reverse the number of screens, and then use the seat viewing distance to check the readability.
- Number of fold decoding paths:According to the "screen number x constant display partition number" conversion, distinguish the total amount of access and at the same time readable; Kanban takes the acquisition link and does not account for video decoding.
- Set the way to see the board on the wall:Source PC output or platform rendering straight out, select according to MES architecture, and verify the performance of the acquisition end.
- Nuclear multi-plant convergence:Grouping plan, authority layering and video access bandwidth shall be confirmed according to platform conditions.
- Do three-net isolation:The cross-network convergence path between video network, production network and office network shall be designed according to the requirements of safety review.
- Compared with the quotation and inspection supplier:Sub-integrity and source factory customization/spare parts capabilities, with real picture acceptance.
2. is divided into two types of tasks: security monitoring is space, production kanban monitoring is the process
The two types of tasks of the factory monitoring center are not as simple as "all pictures. Their signal sources, wall links, resource occupation and specification requirements are completely different, and they must be separated before determining whether they are shared.
| Judgment dimension | Security guard | Production and operation situation |
|---|---|---|
| Monitoring object | Space: perimeter, gate, warehouse, hazardous chemicals area, loading and unloading area | Process: production line status, equipment OEE, plan achievement rate, quality and energy consumption |
| Signal Source | video platform/NVR/camera | MES, SCADA, workshop electronic billboard, equipment platform |
| Wall Link | Platform streaming → decoder → splicing processor → large screen | Web page/client screen → acquisition workstation/encoder → on-screen |
| Whether to occupy video decoding | Yes. Converted by "number of screens x number of divisions of constant display" | It is usually not occupied, but the rendering performance of the collection side needs to be verified. |
| Specification Priority | Multi-screen readability> round tour efficiency> panel grade> patchwork (3.5mm can be established) | Text and Trend Chart Readability> Patchwork (Cross-Stitch Content Sensitive)> Resolution> Brightness Adjustment |
| Shared Judgment | The security center is mainly based on video, and the kanban is used as an auxiliary window; the production command center is mainly based on kanban, and the video is used as an auxiliary; the comprehensive monitoring center needs dual-path structure support.Sharing is possible, but the capacity and responsibilities of the two links must be verified separately. | |
The video and kanban are displayed on the same screen, which does not mean that the data of the two systems are consistent in real time. Stopped kanban, frozen video, looks the same as the normal picture, but may have expired for a few minutes. In a factory scenario, a stop-and-stop production line or a frozen hazardous chemical area may lead to incorrect production scheduling or safety judgment.The scheme must check whether the timestamp of the kanban data is visible, whether there is a prompt when the watch is stopped, and whether the alarm mark is displayed in the window when the video is frozen. The detection and generation of these prompts are the responsibility of the platform or processing equipment, and the screen wall acceptance verification is "whether the prompt is correctly presented".
List of 3. signals: four types of signals, four links
The signal source of the factory monitoring center can be divided into four categories according to the wall link. It is the basic work of the scheme design to mark "source, access method and responsible party" item by item when making the list.
| Signal type | Typical sources | Wall Link | Responsible party | Whether to occupy video decoding |
|---|---|---|---|---|
| Monitoring video of plant area | video platform/NVR/camera | Platform streaming → decoder → splicing processor → large screen | Security/IT Integrator | Yes. Conversion by number of screens and number of divisions |
| Production KPI Kanban | MES/SCADA/Equipment Platform | Web page/client screen → acquisition workstation/encoder → on-screen | Production/IT Platform Vendor | Usually not occupied, the performance of the collection end needs to be verified. |
| Access Control/Vehicles/Visitors | Access control system, parking system, visitor system | Business system client screen → collection or matrix → on-screen | IT System Vendor | Depends on the output mode; independent client goes through the acquisition link |
| Fire/Safety Alarm | Fire alarm host, security alarm system | The alarm event enters the security platform → call the associated video → go up the wall | EHS System Vendor | Alarm events do not account for decoding; linked pop-up videos account for decoding |
There are two kinds of structures on the wall of the kanban. If you choose the wrong one, you will get stuck.
The production of kanban walls is not as simple as "opening the web page and throwing it up. The two common architectures differ greatly:
- Source PC output mode: Open the MES/SCADA Kanban page on the PC connected to the large screen and output it to the splicing processor via HDMI. The advantage is that it is simple to realize and does not rely on platform transformation. The disadvantage is that each kanban needs a PC window. When multiple kanban boards are on the same screen, PC performance and window management become bottlenecks, and the resolution and refresh rate of kanban are limited by PC output capacity.
- Platform rendering straight out mode: The management platform configures the data source and directly renders the kanban screen and outputs it as a video stream. The advantages are unified management of multiple boards and better resolution matching. The disadvantage is that platform support is required, additional authorization may be involved, and the kanban data interface needs to be open.
Criteria for judgment: If the number of kanban boards is small (2-3 pieces) and the content is relatively fixed, the source PC mode can be established. If the number of kanban boards is large and frequent switching or dynamic refreshing is required, it is safer to render the platform directly, but it is necessary to confirm whether the platform supports it and whether MES opens the data interface.Either way, the wall demonstration must be made with the real MES page of the factory.Instead of using static screenshots-the rendering fluency of dynamic charts and maps can only be measured on real pages.
Counting the number of screens 4.: using the window draft to push back, not starting with "other people's house a few pieces"
The number of screens is not directly determined by "monitoring center area" or "budget", but by "how many readable windows need to be displayed at the same time. The starting point of the reverse thrust is aDraft window layout。
Three Steps and Formula of Reverse Thrust
The security window is divided by 4-9/screen, and the kanban window is divided by the whole screen or 2-4/screen. Take the larger screen number requirement of the two types of tasks as the basic configuration.
- Number of windows: How many key images (perimeter, gate, warehouse, hazardous chemicals area) do you need to monitor at the same time in security mode? How many kanban windows do you need in production mode (production line situation, KPI trend, detail tracing)? For example, security requires 16 key image rounds to patrol the area, and production requires 3 kanban windows and 1 detail window.
- Number of converted screens: The key security picture is divided into 4 parts (4 windows per screen) and 9 parts for general round rounds. The production billboard uses the whole screen or 2 parts (to ensure that the text and trend chart are readable). The larger value shall be taken after conversion respectively, and rounded up to the common number of rows and columns such as 2 × 3, 3 × 3 and 3 × 4.
- Check readability: Check with the nearest/farthest seat distance: whether the license plate and personnel characteristics in the security window can be identified; Can KPI numbers and trend lines in the kanban be seen clearly. If the farthest seat cannot see the text in the 9-split window clearly, reduce the number of splits or increase the number of screens; If the nearest seat is too close to make the seam obvious, adjust the screen wall position or seam level.
An auto parts factory monitoring center, available wall about 5 meters wide, 2.8 meters high, the nearest seat distance of about 2.5 meters. The security mode requires 12 key pictures to be displayed frequently (perimeter 4, gate 2, warehouse 4, hazardous chemical area 2) and 16 rounds. The production mode requires 2 production lines, 1 KPI trend, and 1 detailed traceability. According to the calculation of 55-inch single screen (about 1222mm × 696mm): about 4.4 meters after the horizontal 5-meter buckle maintenance space, it can be arranged in 3 rows; Longitudinal 2.8 meters buckle bottom cabinet and top reserved about 2.0 meters, can be arranged in 2 rows (total height about 1.39 meters). 3 × 2=6 screens, 3 screens are required for security display 12 channels according to 4 divisions, 2 screens are required for round tour 16 channels according to 9 divisions, 2-4 screens are required for production billboard 4 windows, and 6 screens can be covered. If the security key picture requires "the gate picture must be large", it can be adjusted to 3 × 3 with 9 screens, and the gate picture accounts for 2 screens to be divided into 2 screens. The specific draft window and sight distance check shall prevail.
5. the number of folding decoding paths: distinguishing the total amount of access and simultaneous readable.
"Access to 500 Road" and "see 50 Road at the same time" are two different things. The decoder does not need to be bought according to the total number of cameras, but should be converted according to the "number of screens × number of constant display partitions" and distinguish three calibers:The total number of platform accesses, the number of simultaneous access flows, and the number of simultaneous decoding on the wall. The round tour is time-sharing switching and does not increase the upper limit of simultaneous display.
| Single-path resolution | Conversion factor | If the decoder is fully equipped with 64 channels 1080P, it can be solved simultaneously. | Description |
|---|---|---|---|
| 1080P | 1 | 64 way. | Factory monitoring mainstream resolution |
| 4K/800W | about 4. | Approximately 16. | Adoption of new projects or key areas, converted according to actual proportion |
| 720P | Approximately 0.5. | About 128 road. | Common in legacy frontends; confirm whether it is still in use. |
The new factory project should reserve 20%-30% decoding margin according to the growth of monitoring points in the next 2-3 years, and verify the platform forwarding concurrency and network bandwidth. The smallest of the three values is the actual number of channels that can be simultaneously displayed on the wall. Bandwidth estimation: number of concurrent paths × single-path code rate (H.265 1080P is about 2-4Mbps), and then overlay platform forwarding, storage backhaul and other service occupancy, leaving 30%-50% margin.
Multi-factory convergence in 6.: what to watch locally, what to watch in general control, and how to adjust the video
The monitoring of manufacturing enterprises is often distributed in multiple workshops or even multiple branches. The convergence of multiple factories is not as simple as "transmitting all the pictures to the headquarters", but to answer three questions: what the local duty watch, what the general control center watches, and how to match the video access rights and bandwidth.
| Level | Design content | Technical points | under what conditions |
|---|---|---|---|
| Local Duty Level | Monitoring room of workshop or guard duty point to monitor the picture of this area | Local NVR/decoder, retain the daily operation ability; when the network is disconnected, the local can still monitor | There is a need for independent duty in the workshop; network interruption cannot cause local "total blindness" |
| General control convergence layer | The videos of each plant area are gathered to the general control center through the platform, and displayed in groups and enlarged on demand. | Grouping plan (by plant/workshop/area), authority stratification (which pictures can be adjusted by the overall control), fixed display of key parts | The platform supports multi-level cascading; the network bandwidth meets the requirements of multi-channel simultaneous streaming; the master controller has clear scheduling responsibilities |
| Video access layer | Headquarters Access to Branch Factory Video | Depends on platform and storage architecture: centralized or distributed storage; | At the scheme stage, it must be confirmed that "video can be watched after convergence" cannot be defaulted. Access bandwidth is estimated separately. |
7. factory type differences: chemical, electronics, food, logistics, automobile manufacturing are not the same set of configuration
"Factory Park" is a broad term, and the monitoring focus and Kanban requirements vary greatly from industry to industry. Sleeve all plants with the same solution is the most common over-configuration or under-configuration in plant projects.
| Plant Type | Key monitoring points | Kanban Focus | Splice screen configuration tendency | Special Requirements |
|---|---|---|---|---|
| Chemicals/Hazardous Chemicals | Hazardous chemicals warehouse, tank farm, loading and unloading area and explosion-proof area | Safety parameters, gas monitoring, alarm status | Patchwork 1.8mm priority (alarm screen cross-screen), medium brightness, industrial panel | Equipment in explosion-proof area shall meet explosion-proof requirements; alarm linkage has the highest priority |
| Electronic manufacturing | Clean workshop, production line, warehouse, entrance and exit | Production line beat, yield, equipment OEE | Patchwork 1.8/3.5mm, high resolution for kanban window | Dust prevention should be considered for installation in clean workshop; high refresh frequency of kanban |
| Food processing | Bright kitchen bright stove type health monitoring, cold storage, raw material area | Temperature and humidity, hygiene compliance, batch traceability | 3.5mm can be established, brightness according to the environment | Cold storage/humid environment requires wide temperature and moisture protection; Video storage time requires high |
| Logistics warehousing | Warehouse location, loading/unloading area, forklift line, perimeter | Inventory status, issue/receipt efficiency, and exception alarm | 3.5mm mainly, the number of screens is determined according to the quantity of the reservoir area | Large space for long-distance viewing, brightness can be appropriately improved; forklift moving line needs continuous picture |
| Automobile manufacturing | Multi-workshop convergence, final assembly line, parts traceability | Production line beat, parts set, quality data | 1.8mm or distributed architecture, many screens | Multi-workshop fiber convergence; clear division of labor between master control and workshop; predictable expansion demand |
The type of factory directly changes the focus of the plan: chemical projects are most afraid of "the alarm screen is cut off by patchwork" and "the equipment in explosion-proof area is not in conformity"; Electronic manufacturing is most afraid of "kanban refresh Caton" and "clean workshop installation pollution"; Food projects are most afraid of "failure of cold storage environmental equipment"; Logistics storage is most afraid of "insufficient bandwidth for multi-workshop convergence". The plan design shall confirm the plant type before deciding on the configuration basis of patchwork, brightness, panel grade and structure.
8. three-network isolation: cross-network convergence path of video network, production network and office network
The link that the factory monitoring center is most likely to be stuck in the safety review stage is "cross-network docking". Video monitoring is usually in the video private network, MES/SCADA in the production network, office system in the office network, the three networks have different security and isolation requirements, and all signal lines cannot be simply plugged into the same processor.
| Network Domain | Typical signal | Isolation Requirements | Cross-network convergence mode |
|---|---|---|---|
| video private network | Monitoring video and alarm linkage picture | Isolated from production network and office network; according to enterprise security policy | The video stream is decoded and converged in the display layer, or ferried through the video security access gateway. |
| Production network | MES/SCADA dashboard, equipment status | Isolated from video network and office network; production data is not available on the network. | The kanban screen enters the display system after being converted into a video signal by the acquisition workstation/encoder, and does not directly transmit production data across the network. |
| Office network | Visitor system, access control, OA | Isolated from production network; by enterprise IT strategy | The client screen of the business system is collected and displayed on the screen, or is docked with the approved interface. |
Error 1: All signals are directly connected to the same processor. Three networks physical direct connection, in violation of isolation requirements, security review may be directly rejected.Mistake 2: Use a multi-port computer to do "signal transfer". Computers cannot replace security isolation devices, and their stability and concurrency capabilities are insufficient.Mistake 3: Promise "arbitrary system interoperability". Integrators should not promise cross-network direct connection or any system interoperability, cross-network path must be approved by the owner, according to the enterprise security policy design. In the plan, it should be clear "which signals can cross the network, through what equipment, and whether the signals after crossing the network are classified/transcoded", and the isolation equipment should be included in the quotation.
9. budget trade-offs and source plant value
The budget of the plant project varies greatly, but the risk of "winning the bid at a low price and adding items at a later stage" is widespread. When the budget is limited, the recommended order of trade-offs is:First, ensure the readability of the security display window (if the perimeter and hazardous chemicals area cannot be seen clearly, the security watch will lose its meaning), then ensure the collection performance of the wall on the kanban (kanban Caton, production command is the decoration), then set the seam according to the nearest viewing distance (3.5mm can be established at a distance above 2.5 meters), and finally consider the extra margin of brightness and consistency. Don't sacrifice the number of screens or the performance of the collection side for the sake of "0.1mm smaller patchwork"-the former is a plus for perception and the latter is the bottom line of the business.
Quotes must be itemized to account
- Screen: Specific model, panel source and grade (industrial grade A or ordinary grade A), patchwork specifications, brightness and resolution. If only "55-inch splicing screen" is written but not the model and grade, clarification is required.
- signal processing equipment: Decoder model and number of channels, processor input/output channels and windowing capabilities, number and configuration of Kanban acquisition workstations.
- Structure and installation: Bracket type (wall hanging/front maintenance hydraulic/floor cabinet/non-standard customization), load-bearing accounting, cable brand and length, and removal of old equipment.
- Cross-network and joint debugging: Safety isolation equipment, kanban data interface docking, multi-plant convergence configuration, alarm linkage joint debugging. This part is the most easy to miss the factory project.
- Service and Delivery: Commissioning scope (including kanban configuration and plan preparation), training sessions, quality assurance starting point, spare parts list and after-sales response time limit.
Qunmao LCD splicing screen China source factoryThe value of direct supply is more prominent in factory projects than in ordinary commercial scenarios. The space of the factory monitoring center is often irregular-the positions of pillars, load-bearing walls, and equipment limit the installation of standard brackets; different factory types have large differences in requirements for stitching, brightness, and protection levels; splicing walls have a long service life, five years The supply of spare parts after the year is more important than the unit price at the time of purchase. Qtenboard, for example, whose factory supports43-75 inch full size, 8mm to 0mm full patchwork gearpanel selection, supportOem/odm/ckd/skdCooperation mode, can be customized according to the project requirements of patchwork combination, non-standard bracket, interface configuration and packaging. Its public information shows that it has a self-operated manufacturing base, and the panel has undergone 48-hour aging test and color calibration to support 7 × 24 continuous operation scenarios-these capabilities correspond to the real needs of the factory monitoring center for "long-term operation, complex environment and limited operation and maintenance capabilities. For integrators and plant project parties, the value of the source plant lies inThere is no need to "gather together" in the standard", but according to the actual window layout, viewing distance and environmental conditions of the monitoring room to choose the seam and size;Spare parts supplyIt is also more controllable than traders-when the factory needs to replace units after a few years of use, the source factory can provide the same type of panel or module, rather than "replacing the whole wall". During the evaluation, it is essential to verify the factory’s qualifications, the source of the panels, and actual case studies, rather than relying solely on the label “directly supplied by the factory.”
10. Site Investigation List and Core Items of Acceptance
The site conditions of the factory monitoring center directly determine whether the screen wall can be installed or not. The following checklist should be completed during the programme phase.
| Exploration Item | What needs to be confirmed | Impact on selection |
|---|---|---|
| Wall Size and Bearing | Available width and height, wall type, whether steel structure is required | Decide on the number of rows and installation methods; light partitions require floor cabinets or reinforcement |
| Seat sight distance | Distance from nearest/farthest seat to screen wall | Determination of the lower limit of readability for the grade of patchwork and the number of splits |
| Environmental conditions | Temperature and humidity, dust, corrosive gas, ambient light | Decide on the panel protection level, brightness and heat dissipation design; installation on the workshop site requires wide temperature and dust prevention. |
| Maintenance space | Front maintenance or rear maintenance, whether there is disassembly space around | Determine bracket type (wall mount/front maintenance hydraulic/cabinet/non-standard) |
| Power Supply and Network | Power supply capacity, socket location, triple network access location | Decide on cabling and equipment layout; reserve isolation equipment locations for cross-network convergence |
| Platform and Kanban Interface | Video platform brand, MES/SCADA board output mode, alarm host model | Decoder compatibility, Kanban collection method and linkage responsible party |
Core items of acceptance
- Security readability: Use the real monitoring screen of the plant area to show whether the nearest/farthest seat can identify the characteristics of personnel and vehicles according to the security layout.
- Kanban readability: Use the real MES/SCADA page of the factory to check whether KPI numbers, trend charts and status lights are continuously distinguishable at the seam, and whether dynamic refresh is smooth.
- Stop and freeze tips: Simulate that the kanban data stops updating and the video stream is interrupted, and check whether the large screen displays "data expired" or "signal exception" within the agreed time.
- Alarm linkage: Simulate the triggering of safety/fire alarm, measure the pop-up time, picture correctness, video marking, and restore layout; test the priority of two concurrent routes.
- Multi-plant convergence: Check the permission and response of the general control to see the delay of the picture of the branch factory, the switching of the group plan, and the video access.
- Continuous operation: Operate at full load for a specified period of time (e. g. 72 hours) without failure or performance degradation.
XI. Common Misunderstandings
- Myth 1: The production of kanban into the video decoder. Kanban is an application picture, which takes the acquisition link and does not occupy video decoding resources. The stuffing decoder not only wastes the number of decoding paths, but also may display abnormalities due to the mismatch of refresh methods.
- Misunderstanding 2: Buy decoders directly with "monitoring the number of roads. Factory 500-way monitoring does not mean that 500-way decoding is required. Decoding is converted according to "screen number x constant display partition number", and the upper limit of simultaneous rotation is not increased. Leave 20%-30% margin for new projects.
- Misunderstanding 3: Think that "you can watch videos when you gather". Multi-factory convergence solves real-time picture scheduling. Video access depends on platform and storage architecture, authority and bandwidth, and must be confirmed separately in the scheme stage.
- Misunderstanding 4: Cross-network docking "pick it up first". Direct connection between video network, production network and office network may be directly rejected by security review. The cross-network path must be approved by the owner, designed according to the enterprise security strategy, and the isolation equipment is included in the quotation.
- Myth 5: All factories have the same configuration. Chemical explosion-proof and alarm priority, electronic clean workshop and high refresh kanban, food cold storage moisture-proof, logistics of long-distance large space, car multi-workshop convergence-configuration logic is completely different.
- Misunderstanding 6: Use the demonstration film for acceptance, not the real picture. The supplier demonstrated high-contrast video and static kanban screenshots. The real monitoring screen and dynamic MES page effect of the factory are often much worse. Acceptance must use the factory's own content.
- Myth 7: Think the "source factory" is just cheap. The value of the source factory is in non-standard bracket customization, patchwork size combination and long-term spare parts supply. The assessment verifies factory qualifications and panel sources, rather than just looking at publicity.
XII. FAQ
Can security monitoring and production kanban share a splicing screen?
It can be shared when platform authorization, processing capacity and layout readability meet requirements. The video goes through the decoding link and the Kanban goes through the acquisition link. The capacity of the two paths is verified separately. Two sets of independent hardware are not required. However, if the number of kanban boards is large, refreshing is frequent, or the key security pictures require "large windows are always displayed", it is recommended to layout in different areas or plan the screen wall separately.
How does the video of the multi-branch factory converge to the large screen of the headquarters?
The videos of each factory area are gathered to the general control through the platform, and displayed according to the grouping plan (grouped according to the factory area/workshop/region, fixed display of key parts, and rounds of the rest), and the authority is managed in layers. Whether the headquarters can access the video of the branch factory depends on the platform and storage architecture. It must be confirmed in the scheme stage, and it cannot be defaulted that "the video can be watched when it is gathered". The bandwidth and latency of cross-plant access need to be estimated separately.
Does the wall on the MES kanban occupy video decoding resources?
Usually not occupied. Kanban through the web/client screen through the acquisition workstation or encoder to the video signal screen, do not go through the video decoder. However, if the kanban picture is encoded as a video stream and then enters the decoding link, decoding resources are also involved and need to be confirmed item by item. The rendering performance of the collection side is the key to the wall on the kanban and must be tested with a real MES page.
Workshop dust, high temperature, splicing screen can be installed?
You cannot judge by the Room Name alone. Whether installed in the monitoring center or the workshop site, the applicability of the equipment shall be verified according to the actual temperature and humidity, dust, corrosive gas and ambient light. The workshop with large dust needs higher protection level or positive pressure heat dissipation design. High temperature environment needs wide temperature panel; Corrosive gas environment needs special protection. These requirements should be made clear at the programme stage, rather than waiting for the equipment to arrive and then "finding a way".
Can the existing cameras and NVR benefit the old?
Verify stream fetching permission, protocol code (GB/T 28181, ONVIF), interface matching, software authorization and actual display effect item by item, and compare the complete cost of reuse and replacement. The mixing of old and new screens must be tested by lighting on the same screen. When the color difference and brightness attenuation are obvious, do not mix them forcibly. Some units can be used or replaced in different areas.
Does patchwork have a big impact on the factory's large screen?
Judge by whether the window is across the seam, the position of key content and the viewing distance of the seat. Security video multi-picture segmentation scene, 3.5mm patchwork can be established at a distance of more than 2.5 meters; When the trend chart, map and status light in the kanban are displayed across the seam, or the digital twin/factory model is presented on the whole wall, the patchwork priority is increased and should be inclined to 1.8mm or less. When the alarm screen of chemical project is displayed across the screen, patchwork is also sensitive.
What is the use of LCD splicing screen China source factory for factory projects?
Three practical values: first, when the space of the factory monitoring room is irregular, the bracket and splicing combination can be customized according to the project instead of being combined in standard products; Second, different factory types have different requirements for protection, brightness and splicing, and the configuration flexibility of the source factory is higher. Third, when the splicing wall needs to be replaced after five years, the supply of spare parts in the source factory is more reliable than that of traders. During the assessment, factory qualifications, panel sources, and actual case studies are verified.
XIII. Conclusion
The complete judgment chain of the factory park monitoring splicing screen scheme can be compressed into six steps:
First, it is divided into two types of tasks (security/production) → list the signal list and divide the link → use the window draft to push back the number of screens → convert the number of decoding channels according to the frequently displayed position → nuclear multi-plant convergence and three-network isolation → compare the complete itemized quotation and real picture acceptance.
The particularity of the factory scene is not in the "larger screen", but inThe links of the two types of tasks are different, the responsible parties are different, the risk of false real-time is higher, and the security constraints of cross-network docking are stricter.. The professionalism of the program is reflected inThe security picture can really be seen clearly, the kanban data can really be brushed, there are really hints for stopping and freezing, cross-network convergence can really pass the safety review, and spare parts can really be found after five years of failure.. Write these judgments into the draft window, decode conversion, triple-net isolation design and acceptance list, and then use them.LCD splicing screen China source factoryThe factory monitoring center is not "installed for leaders to see", but the operation interface that security guards and production scheduling really rely on.
Security to see the space, kanban to see the process.
Current location:
Release date: 2026-10-21
Clicks:
Previous:
Return to list
Partner Links: