From the regular display of the dispatching screen, the access responsibility of the safety zone, the backstepping of the screen wall and the acceptance caliber of the patchwork seam, to the continuous operation, the seat authority, the customization ability of the transformation cutover and the source factory, the landing judgment of the splicing screen of the power dispatching center is given.
The most expensive mistake in the splicing screen scheme of the power dispatching center is not that the screen is too expensive to buy, but that "a node on the wiring diagram is cut off by the patchwork, and the dispatcher looks less".The large screen in the dispatching hall is the "dashboard" for power grid operation-wiring diagram, power flow data and over-limit alarm must be read clearly at a glance, while the power monitoring system is restricted by the "Regulations on Safety Protection of Power Monitoring System" (Decree No. 27 of 2024) and is protected according to the 16-character principle of "safety partition, network specialization, horizontal isolation and vertical certification. The screen wall scheme cannot be planned separately from the security partition architecture, nor can the general expression "support XX road access" replace the capacity verification of the sub-link. More importantly, the screen wall of the dispatch hall is not a "display device",Operator interface between dispatcher and grid: Which line's trend exceeds the limit, which factory station's alarm pops up, and whether the layout can be restored with one click during shift change determine whether this screen is "useful" or "furnished". This article is carried out in the order of "always showing the picture → safe partition access → screen wall reverse pushing → capacity sub-link → continuous operation → seat authority → transformation cutover → acceptance quotation". Each link gives the starting point that can be judged and the acceptance caliber that can be measured, and explainsLCD splicing screen China source factoryThe actual value of direct supply in patchwork combinations, non-standard supports and long-term spare parts.
1. the screen wall of the dispatch hall and answer "which pictures must be displayed frequently"
The layout of the screen wall in the dispatching hall cannot start with "buying a few screens", but with "where the dispatcher is, what content to see, and what must jump out when abnormal. The power grid implements unified dispatching and hierarchical management. The dispatching organization is divided into five levels. The daily core picture of the local/county-level hall usually includes five categories.
| Screen type | Typical content | Layout Priority | What conditions must be amplified |
|---|---|---|---|
| Grid/Station Wiring Diagram | Primary wiring, switch status and tidal current direction | Main screen area, occupying the whole screen or cross-screen | When the wiring diagram crosses the screen, the patchwork shall not interrupt the key nodes and line labels. |
| Power flow/voltage/frequency data | Real-time value and out-of-limit alarm | Data area, next to wiring diagram | When the alarm pops up, the data window cannot be removed by the round trip. |
| Load and trend curve | Load curve, forecast deviation | Auxiliary screen area or lower edge of data area | When the curve crosses the screen, the continuity at the patchwork joint shall be measured. |
| Auxiliary information | Meteorological, hydrological and maintenance plan | Auxiliary screen area, round-robin | It is not required to be displayed frequently, but it needs to be read quickly during shift change. |
| Industrial TV/Inspection Video | Factory station video and equipment inspection screen | Independent video area or auxiliary screen | When the alarm is linked, the corresponding video should pop up to the specified window. |
2. security partition is a hard prerequisite: two lists, no cross-zone control scheme is provided.
Article 4 of Decree No. 27 divides the protection area of the power monitoring systemProduction Control Area (Safety I/II)andManagement Information Area (Safety Area III/IV)Article 9 requires that the connection between the production control area and the management information area and the safe access area shall be equipped with a horizontal one-way safety isolation device for electric power. The screen wall scheme must be based on the access structure approved by the owner,Cross-zone connection scheme or default cross-zone connection scheme is not provided。
| Signal Source | Safe area | Link to the display system | Responsible party |
|---|---|---|---|
| Dispatching master station/EMS screen (wiring diagram, data) | Production Control Zone (Zone I/II) | Graphic acquisition or signal output method approved by the Owner | Dispatching automation centralized integrator |
| Plant station video monitoring | Management information area or video private network | Video platform streaming → decoding → display (isolation device according to the owner's architecture) | Information and Communication Integrator |
| Conference video/conference screen | Management Information Area | Conference terminal output → Matrix/Processor | Information and Communication Integrator |
| Existing analog screen/old screen image output | According to the original system area | Confirm whether there is available image output (communication interface ≠ display signal) | Owner Confirms Integrator Verification |
Existing analog screens or old systems may provide communication interfaces (RS232/network ports), but this does not mean that it can output image signals that can be used on the wall. In the renovation project, it is necessary to confirm whether the old system has available video output (HDMI/DVI/SDI/network stream) before judging whether the new screen wall can be connected. Using the communication interface as a display signal source is one of the most common misjudgments in renovation projects.
Reverse thrust of 3. screen wall: calculate the number of rows and columns from the net size of the hall and the line of sight of the seat.
The size of the screen wall of the dispatching hall is determined by the wall conditions of the hall, the layout of seats and the number of frequently displayed images. An operational starting point is:
Number of candidate rows ≈ wall usable height ÷ single screen height (rounded down) Deduct the maintenance space on both sides, the bottom cabinet/maintenance height, and the top reservation; then use the nearest/farthest seat's line of sight to check the elevation angle and readability.
Take a 55-inch single screen (appearance about 1222mm × 696mm) as an example. A local transfer hall can have a clear wall width of about 7.5 meters and a clear height of about 3.5 meters, with 50cm cabinet space reserved at the bottom, 30cm reserved on both sides and 20cm reserved at the top: the usable wall width is about 6.6 meters, 6.6 ÷ 1.222 ≈ 5.4, take5 columns; Available height is about 2.8 meters, 2.8 ÷ 0.696 ≈ 4.0, take4 lines. The candidate size is 5 x 4 for a total of 20 blocks. If the nearest seat is too close to cause the elevation angle to be too large, or the farthest seat cannot see the wiring diagram label clearly, it is necessary to reduce the number of rows, increase the size of a single screen or adjust the installation height of the screen wall. In the actual project of the industry, 55-inch 6-row 5-column, 46-inch 5 x 10 and other configurations have appeared, specific to the hall conditions.
Patchwork: divided into "nominal caliber" and "installation acceptance caliber"
Patchwork in procurement documents is usuallyNominal caliber(such as double-sided flat seam ≤ 3.5mm), but the actual installation of the flat seam by the bracket accuracy, leveling process and screen body tolerance, may be different from the nominal value.Acceptance caliberIt should be clear whether the allowable deviation of the patchwork width, the uniformity of the patchwork (whether the width of each patchwork is consistent), and whether the key picture (wiring diagram node, line label) is interrupted by the patchwork. When selecting the type, it is not necessary to blindly pursue the narrowest patchwork seam, but in the main screen area where the wiring diagram is displayed across the screen, the patchwork seam should be evaluated first and below 1.8mm; The data area and video area can be relaxed according to the budget.
4. capacity sub-link: graphics acquisition, video decoding, windowing, back control, can not be combined into a sentence
The capacity requirements of the dispatching hall must be divided into links, and "XX routes supported" cannot be written in general terms ". The capacity caliber of the four links is different, and mixing together will cause one side to become a bottleneck.
| Link | Capacity caliber | Conversion logic | verification method |
|---|---|---|---|
| Graphics acquisition | Number of simultaneously acquired graphics workstation/EMS screen paths | Conversion based on the number of always displayed wiring diagrams, data windows and trend charts | Collect and screen at the target resolution at the same time, and observe whether the frame is lowered or stuck. |
| Video Decoding | Number of simultaneously decoded surveillance video paths | Converted according to the number of windows in the video area × the number of divisions; rounds do not increase the simultaneous upper limit | Simultaneous decoding of full video window to observe picture quality and frame rate |
| Splicing output and windowing | Total number of wall windows, single output interface resolution | Configure the maximum number of windows according to the alarm consultation plan | Switch the plan under the full-load window opening state, observe the response and picture integrity. |
| Seat back control | Number of seat channels that can be controlled back | Configure according to the number of seats that need to be controlled back by dispatchers, automatic operation and maintenance, etc. | Whether the response time and permission isolation of the return control operation are effective |
The wiring diagram, data kanban, and video are displayed on the same screen, which does not mean that the data time of the three is the same. Check whether the refresh period of the wiring diagram, the data timestamp is visible, and whether the video stream has a freeze prompt.Stopped kanban and frozen videos are mistaken for real-time status, which is the most important risk to be prevented in the dispatching hall. The detection of these prompts is the responsibility of the platform or processing equipment, and the screen wall acceptance verification is whether the prompt is correctly presented.
5. continuous operation with failover: 7 × 24 is part nominal, not system without single point
"Support 7 × 24" usually refers to the continuous operation of the screen body or components, which does not mean that the entire display system has no single point of failure. The dispatching hall needs to be checked by links: which pictures are affected by screen failure, processing equipment failure, signal link failure and power supply failure, what are the recovery methods, and how long is the expected recovery time.
| Fault link | Affected screen | Recovery capacity to be confirmed by the scheme |
|---|---|---|
| Single screen failure | The area displayed on this screen | Replacement time of spare parts; whether the whole wall needs to be re-colored after replacement |
| Handling equipment failure | The device is responsible for the output channel | Whether there is redundancy or hot standby; switching time; whether the switching process is black |
| Signal link interruption | Corresponding Source Window | Whether to display "signal interruption" prompt; whether to automatically reconnect; reconnect time |
| Power outage | Screen wall and decoding equipment | Whether to connect UPS or independent circuit; whether to automatically restart and restore the layout after recovery |
Attention should be paid to the screen body of the dispatching hall.Applicable conditions for long-term static images: The wiring diagram and the fixed data window may display the same picture for a long time. When selecting the model, confirm the anti-burning/residual management capability of the screen body, and require the supplier to provide reference cases of similar static display scenarios. The brightness/color calibration process after replacement of spare parts should also be written into the contract-if the color difference of the new screen is obvious, the consistency of the whole wall will be destroyed.
6. seat permissions: who can go on the screen, who pushes, who controls back, list
The dispatching hall has dense seats and many signals, and the permission design is more complicated than that of the ordinary monitoring center. The core issues are:What can dispatchers, automated operations, information communications, and leaders do?。
| Character | View screen | Push on screen | Modify layout/plan | Return control |
|---|---|---|---|---|
| Dispatching attendant | Wiring diagram, data, video | Can be pushed to a specified area (subject to conflict rules) | Plan cannot be modified | As authorized by the Employer |
| Automated Operations and Maintenance | System status and alarm | Can push operation and maintenance related screen | Operation and maintenance plan can be modified | Operation and maintenance channel |
| Information and communication | Video, conference, network status | Can push communication related screen | Can modify communication plan | Communication equipment |
| shift supervisor/leader | All | Can be pushed, can be covered | Callable and modify scenarios | By Authorization |
Permission design should be documented in the project plan, rather than agreed upon verbally. Actual measurement during acceptance: whether the scope of different roles can be seen and operated after logging in conforms to the matrix; Whether the conflict handling rules (first come, first served/priority ruling/host agent control) when multiple agents are pushed at the same time take effect; Whether the operation log completely records "who pushed which signal to which window at what time". The call-up time of the consultation plan should also be measured-how long will it take from the initiation of the consultation to the completion of the picture according to the layout of the plan.
7. transformation cutover: the old screen is not to be dismantled or not to be dismantled by the owner, and the cutover condition does not write "zero shutdown"
Many dispatching halls have existing screen walls (analog screens, DLP and LED). Whether to retain the existing screen is determined by the owner according to the business,Do not write "inevitable demolition". This paper discussesShow LinkThe transformation does not involve the transformation of the main station, protection or remote business channel by default.
| Phase | Job responsibilities | Conditions to be confirmed by the Employer |
|---|---|---|
| Parallel period | New screen wall installation and debugging, the old screen wall continues to run | Whether the new screen wall fetching affects the original system; the duration and cost of the parallel period. |
| Verification period | The new screen wall is verified by the always-on list scenario by scenario. | Verify the passing criteria; verify whether the scheduling business is affected during the period. |
| cutover window | Switch to new screen wall for primary use | Window time (night/low load time available); registration process |
| Fallback Conditions | Restoring the old screen wall in case of abnormal cutover | Criteria for triggering rollback; the person responsible for the rollback operation and the time limit |
| Old Link Exit | Old screen wall/old display link disabled or removed | Exit conditions; equipment disposal methods |
The scheduling business has high requirements for continuity, but whether "zero downtime cutover" is established depends on the system architecture, redundant design and the operating window approved by the owner of the specific project. The plan should be written "according to the cutover window and fallback plan confirmed by the owner" instead of "zero downtime". It is more binding to include cutover conditions, verification criteria and rollback responsibilities in the contract than to "guarantee that it will not affect the business.
8. Acceptance, Quotation and Source Plant Value
Acceptance: According to the constant display list, scene by scene, do not light up the whole machine.
The acceptance shall use the actual picture authorized by the owner, and test the scene by scene according to the frequently displayed list in chapter 1: the readability of the wiring diagram at the farthest/lateral seat, whether the alarm pops up in time and will not be released by the round patrol, the picture organization time called out by the consultation plan, whether the disconnection/freezing prompt is visible, and whether the one-key recovery of shift change returns to the standard layout.Do not do "acceptance when the whole wall is lit"-- Normal lighting does not mean that the dispatcher can use it.
Quotation: itemized to screen, processing, seating, cutover and spare parts
The quotation for the dispatching hall project shall be itemized: screen body (model, panel source and grade, patchwork nominal value), graphics acquisition and video decoding equipment, splicing processor and window opening capability, seating and authority system, installation structure (bracket/cabinet/non-standard customization), heat dissipation and environment matching, integration and cutover service, spare parts and quality assurance. Beware of "package price" to cover up short board items-for example, the screen price is low, but the graphics acquisition channel is insufficient or the seat back control channel is insufficient, and the later addition will significantly push up the total cost.
Shenzhen Qunmao Display Technology Co., Ltd. LCD splicing screen China Source FactoryThe value of direct supply is reflected in three specific links in the power dispatch project. First,Combination customization of patchwork and size: The main screen area of the dispatching hall needs the wiring diagram to be displayed across the screen. The matching of the patchwork grade and the single screen size needs to be customized according to the net size of the hall and the line of sight of the seats. The source factory can combine according to the project requirements in the 43-75 inch, 8mm to 0mm gears, instead of in the standard products. Second,Non-standard bracket and installation adaptation: The wall conditions, cabinet depth and maintenance space of the dispatching hall are different. Floor cabinets, front maintenance brackets or non-standard reinforcement schemes need to be customized according to the site. The supporting capacity of the source factory is more controllable than that of pure traders. Third,Long-term spare parts supply: The splicing wall in the dispatching hall has a long service life. When replacing units after five years, the same type of panel or module is required. The spare parts guarantee of the source factory is more reliable than that of traders. Taking Qtenboard as an example, publicly available information indicates that it operates its own manufacturing facilities and supports OEM/ODM/CKD/SKD collaboration models. Its panels undergo 48-hour burn-in testing and color calibration, and its products are designed for 24/7 surveillance applications. For integrators and power project parties, this means thatNo need to configure in the "standard screen standard bracket", but according to the actual picture layout and safety zoning requirements of the dispatching hall to choose the stitching, size and installation method;Spare parts supplyIt is also more controllable than that of traders. The assessment should verify the factory qualification, panel source and actual case, rather than just look at the "factory direct supply" four words.
9. common mistakes
- Myth 1: Separate the screen wall scheme and the safety partition. The zoning architecture of Order 27 is a hard premise. Where the signal comes from, through what isolation, who is responsible for access, must be confirmed with the owner at the scheme stage, can not first set the screen and then "find a way to connect".
- Myth 2: Replace sub-link capacity with "support XX road. Graphics acquisition, video decoding, windowing and return control are four links with different capacities. The general "support XX road" cannot judge which link will become the bottleneck.
- Misunderstanding 3: patchwork only looks at millimeters, not interruptions. If the 0.88mm patchwork seam cuts through the key nodes of the wiring diagram, the impact may be greater than 3.5mm and fall on the blank area. The acceptance shall measure whether the key picture is cut by the patchwork, not only the width of the patchwork.
- Myth 4: Take "7 × 24" as a system with no single point of failure. Component nominal is not equal to system reliability. The sub-link verification screen, processing, signal, power supply failure impact and recovery means are more meaningful than a sentence "support 7 × 24.
- Myth 5: The transformation project promises "zero downtime". The cutover window and fallback conditions are to be determined by the Owner. Instead of a commitment to "no business impact", the programme should write "executed by the confirmed window".
- Myth 6: Think the "source factory" is just cheap. The value of the power dispatch project is customized in the combination of stitching, non-standard brackets and long-term spare parts. Check the factory qualification and panel source when evaluating, not just look at the price.
10. FAQ
LCD splicing screen or LED/DLP for dispatch hall?
According to the viewing distance, the type of screen and budget. LCD has high pixel density in close-range text and wiring diagram details, and is suitable for halls with close dispatchers and mainly graphics and data. LED is suitable for scenes that pursue physical seamless, long viewing distance or whole wall image display. DLP is still used in specific low-glare long-term viewing scenes. There is no single answer, and the measured readability of the frequently displayed picture and the architectural requirements of the Owner shall prevail.
Is the seam as narrow as possible?
No. The value of patchwork is that "the key picture is not cut off", not the number of millimeters itself. When the wiring diagram of the main screen area is displayed across the screen, it is necessary to measure whether the stitching breaks the nodes and labels. The data area and video area can be relaxed according to the budget. If the installation accuracy of 0.88mm patchwork seam is not enough, resulting in poor uniformity, the appearance may not be as good as 1.8mm.
Can the screen wall directly assume EMS/SCADA functions?
Cannot. The LCD screen itself does not undertake the EMS/SCADA service function, and it receives the decoded display signal. The picture or data access shall be undertaken by the relevant system approved by the Owner, and the access path must comply with the security zoning requirements of Order 27. The screen wall scheme verifies "display effect and access responsibility", not "business function".
Is 7 x 24 enough?
Not enough. 7 × 24 is usually the nominal continuous operation of components, which does not mean that the whole system has no single point of failure. It shall be checked by link: what is affected by screen failure, processing equipment failure, signal interruption and power supply interruption respectively, what is the recovery method and how long is expected to recover. Failure impact matrix and spare parts response time limit shall be included in the contract.
Must the old analog screen be removed during renovation?
It is determined by the owner according to the business, and the plan does not include "inevitable demolition". The transformation discusses the display link and does not involve the master station or protection business by default. If the old analog screen has available image output (not communication interface), it can be used as one of the existing signal sources; if not, it can be disposed according to the owner's decision.
What is the use of the source plant for the power dispatch project?
Three points: patchwork and size can be customized according to the net size of the hall and the cross-screen requirements of the wiring diagram; non-standard brackets and cabinets can be customized according to site conditions; long-term spare parts supply is more reliable than traders. During the assessment, factory qualifications, panel sources, and actual case studies are verified.
XI. Conclusion
The judgment chain of the splicing screen scheme of the power dispatch center can be compressed into six steps:
List the frequently displayed picture list → make two lists of signal source and link responsibility according to the safety partition → push back the screen wall scale with the net size of the hall and the seat line of sight → check the capacity by link → split the 7 × 24 into a fault impact matrix → confirm the cutover condition by the owner and accept it scene by scene with the actual picture.
The professionalism of the screen wall in the dispatching hall is not "how big the screen is and how narrow the stitching is", but inThe key nodes on the wiring diagram are not cut off by patchwork, the alarm pop-up is not cut off by wheel patrol, the data stop and video freeze have visible prompts, the transformation cutover has a fallback scheme, and the replacement unit can find the same type of spare parts after five years.. Safety zoning is a hard prerequisite, Owner approval is a hard boundary, and sub-link verification is a hard method. Write these judgments into the constant list, access responsibility table, fault matrix and acceptance outline, and then use them.LCD splicing screen China source factoryThe screen wall of the dispatching hall is not "installed for inspection", but the "dashboard" of the power grid that dispatchers really rely on ".
The list is always displayed to determine the layout, the safety zone to determine the boundary, the sub-link nuclear capacity, the source plant to maintain long-term.