Airport security splicing screens are not the same thing as banks and prisons. The loss of pictures by banks is a lack of records, the loss of pictures by prisons is a responsible accident, and the loss of pictures at airports may directly affect the safety of flight operations. Airside runways, taxiways and aprons are physically isolated from landside terminals and security checkpoints. Field monitoring radar and flight GIS are non-IP signals and cannot be coded and bypassed. AOC/TOC attendants should watch CCTV, radar selection, flight flow and alarm queue on one wall at the same time. Construction is also restricted by skylight period. In this paper, the public bidding data of Zhengzhou, Guangzhou and Changchun airports are used as anchor points, the configuration logic of the three-level wall structure of the airport is disassembled, the splicing, distributed control, non-IP signal access and skylight period screen change are translated into a copyable purchase list, and why the docking of * * LCD splicing screen Chinese source manufacturers * * can withstand airport acceptance more than traders.
The transparency of the airport's political adoption is sufficient to push back the configuration baseline without relying on "experience" to beat the head.
Zhengzhou Airport Apron Tower Monitoring Large Screen Transformation, August 2025 Bid, Purchase24 sets of 46 inch splicing screenAnd auxiliary support, including line auxiliary material construction and installation, control price.250000 yuan (tax included), 30 calendar days after the signing of the contract. The final transaction price was 196700 yuan, and the transaction party was Henan Fengqi Information Technology Co., Ltd. This project corresponds to the apron tower/flight zone control scenario, with the budget water level at the sub-control level.
Guangzhou Baiyun Airport Security Inspection and Transportation Control Center Spliced Screen Procurement, September 2026 bidding price, splicing screen area19.44㎡, total price limit500000 yuan (tax included), covering the removal and transportation of the old screen, the installation, debugging and matching of the new screen, which will be completed in 75 calendar days. The security inspection and transportation control center belongs to the core node of the terminal landside security, and the budget level is higher than the apron sub-control.
Large screen update of Zhengzhou airport monitoring system, June 2026 bid, purchase8 decoders and 8 large monitoring screensIncluding construction and installation, control price390000 yuan (tax included), 30 calendar days to complete, and require suppliers to have electronic and intelligent engineering professional contracting grade two and above qualifications. The key signal of this project is:Decoder single column 8 sets, it was not included in “screen-embedded decoding.”
Changchun Airport AOC Joint Hall Replacement, completed in November 2025,A total of 40 screens in 5 rows and 8 columns,5 day construction period, ACC backup site command site is enabled to ensure non-stop navigation. The core value of this case is not in the budget, but in the construction organization of "not stopping flights and changing screens.
Put the four sets of data together, the classification logic of airport procurement is very clear:Apron sub-control level 250000 (24 pieces, 46 inches), security check and operation control level 500000 (19.44 ㎡),AOC overall control level volume is larger and decoding must be in a single row, skylight period screen change is a hard constraint rather than an option of the construction plan.
The essential difference between the airport scheme and the general monitoring room scheme is in this section. AOC left zone: yard surveillance radar and runway incursion warningCan not enter the patrol group, TOC's security check map return and isolation area access controlCannot be mixed with the picture of the business district., the position camera of the apron sub-control must correspond to the bridge status one by one.
Wall type: 4 × 4,5 × 3 or 6 × 4,55 inches,1.7mm or 0.88mm. Partition solidification: CCTV of the left airside field monitoring radar runway incursion warning apron, GIS of the central area, emergency plan for flight flow, private network picture of round patrol of the right landside terminal, and ticker broadcasting of weather and guest protection at the bottom. The ground service transportation control center of the capital airport uses 8 yuan and 55 inches.0.88mmDistributed structure, support 4K signal access and multi-channel video field monitoring radar on the same screen display.
Wall type: 3 × 3 or 3 × 4,55 inches,1.7mm. Curing window: security check channel, check-in area, boarding gate, baggage carousel and fire fighting channel.No round-robin: Return of security inspection drawing station, border inspection channel and access control of isolation area. The 500000-level project of the security inspection and transportation control center corresponds to this scenario.
Wall type: 2 × 2,46 inches,3.5mm, or single-screen four-split. Signal: camera position, bridge SDK, vehicle GPS overlay, navigation light warning. Zhengzhou Airport 24 46-inch 250000-level projects correspond to this scene.
Independent video network, not connected to the commercial advertising system. Wall type: 2 × 3 or 3 × 3, with emphasis on face/license plate/perimeter alarm linkage. Compliance: such as insurance, secret evaluation, and civil aviation public security platform GB/T 28181 cascade.
The key parts (oil depot, catering, navigation station, UPS room) are divided by small wall or single screen, emphasizing anti-riot shell, dustproof and independent UPS. These points usually do not pursue patchwork accuracy, but require 7 × 24 uninterrupted operation and fast spare parts response.
Size:46 ″/55 ″ industrial LCD, AOC main push 55 ″, apron sub-control 46 ″
Resolution: single screen 1920×1080, response ≤ 8ms, viewing angle 178/178, contrast ≥ 4000:1
Flat-jointing: apron sub-control/TOC ≤ 3.5mm(cost control);AOC/master control ≤ 1.7mm or 0.88mm
Brightness:≥500cd/m²; Terminal check-in hall window location selection 600 ~ 700cd/m² highlight style
Continuous operation:7×24MTBF≥ 60000h, anti-burning screen, intelligent temperature control
Interface: HDMI/DVI/VGA/DP/RS232(RJ45)/Gigabit
Structure: sheet metal complete machine, front maintenance or rear maintenance, and single screen hot plug feasibility shall be confirmed during screen change of apron sunroof.
Certificate: 3C, CNAS/CMA test report, flame retardant shell description (common for airport projects)
The parameters of a 55-inch splicing screen are written in a political document in Henan province more finely than those in most airport bidding documents: brightness uniformity ≥ 98%, service life> 80000 hours, refresh rate support 50/60/120Hz, color restoration capability ≥ 1.07B, built-in GAMMA curve intelligent adjustment, edge shielding function intelligent removal of black edges, normal working noise ≤ 12dB, low blue light certification, andThe edge of LCD display unit adopts heat-resistant materialIn order to ensure the high temperature conditions of flat-splash seam effect. These parameters are particularly worthy of inclusion in the airport window and high temperature environment (the ground temperature of the apron can reach more than 50°C in summer).
Another detail that is easily overlooked isBracket material. A government procurement document requires the liquid crystal display unit to be made of no less than electrolytic galvanized steel, with anti-extrusion design, and the bracket to be made of no less than cold rolled carbon steel, with tensile strength ≥ 200MPa. The requirements for structural safety of the sub-control booth on the apron and the elevated installation position under the luggage hall are higher than those in ordinary indoor scenes, and the bracket cannot be treated as "standard.
In the 2026 project of Zhengzhou airport, 8 decoders and 8 large monitoring screensParallel procurement, separate pricingThe structure itself is a beacon signal: decoding cannot be packaged in the screen. The airport project controller must be listed separately for three reasons: the airside radar is a non-IP signal that requires the controller to open a window for superposition; AOC requires cross-screen roaming and independent scaling of multi-service partitions; The failure of a single node in a distributed architecture does not affect the whole wall.
The security net screen enters the "red area", the navigation display/commercial screen enters the "white area", and the same wall partition is divided but the windows are not dragged each other. The public security private network picture goes to the independent decoding node and does not enter the general round patrol group. This isolation logic is usually reflected in the bidding document as a VLAN ACL clause, which will be checked item by item during acceptance.
Daily Mode: Terminal Round Tour Empty Side Thumbnail. Emergency mode: runway incursion → full wall locking of the aircraft position. The radar circle selects the public security pop-up window to broadcast subtitles.Walkthrough ModeDriven by desensitization data, it does not affect the production network. The design of drill mode is not required in the bank and prison plan, but the airport regular emergency drill is a rigid requirement, and the supplier can be required to demonstrate as a differentiated function item during procurement.
All decoding nodes, NVRs, and splicing controllers follow the same NTP (docking airport clock system). The alarm screenshots are marked with "camera number UTC frame stamp" and should be checked by the Civil Aviation Administration/Public Security Bureau. A government document in Henan requires NTP synchronization error to be no more than 2 seconds between devices, and the clock source of airport projects is usually more stringent.
The construction organization for AOC replacement at Changchun Airport is worth writing into the tender document for reference: 5-day construction period, 40 screens, ACC backup command site, post-flight construction, seamless switching of old and new equipment. When purchasing, the supplier shall be required to provideSOP for Screen Change during Sunroof Period, including single-screen hot plug process, spare parts arrival time, emergency recovery plan. Redundant power supply for the control node and non-stop wall for card replacement are the basic requirements.
Configuration: 2 × 2,46 inches, 3.5mm patchwork, brightness 500cd/m. Single node decoding 16~32 1080P. Pick-up camera, bridge status, perimeter thermal imaging. Local NVR alarm linkage.
Budget Reference: Zhengzhou Airport 24 46-inch Spliced Screens Including Bracket and Installation, Control Price 250000, Transaction 196700. The scale of 2 × 2 (4 pieces) is converted according to the number of screens, and the screen bracket is installed in the range of 3~50000 yuan.
Configuration: 3 × 3,55 inches, 1.7mm stitching, brightness 500 ~ 600cd/m. Distributed control or dual decoding node, real solution 32 to 64. Curing window: boarding gate/security check channel/check-in/isolation area access control.
Budget Reference: Baiyun Airport Security Inspection and Transportation Control Center 19.44 ㎡ Splicing Screen Including Demolition and Installation, Price Limit 500000. The scale of 3 × 3 (about 7 ㎡) is converted by area, and the screen body control installation is roughly in the range of 15~200000 yuan.
Configuration: 4 x 4 or 5 x 3,55 inch, 0.88mm or 1.7mm. Distributed node chassis radar/GIS gateway board. Air-side land-side public security flight GIS four-split screen curing. GB/T 28181 cascades to higher-level civil aviation/public security platforms.
Budget Reference: Capital Airport Ground Service Transportation Control Center 8 55-inch 0.88mm Distributed Structure; Changchun Airport has 40 screens, 5 rows, 8 columns and 5 days. The budget for screen control construction of AOC-level projects is usually in the range of 50~1.2 million yuan, depending on the number of screens and the specifications of the joints.
Configuration: 2x3 or 3x3, 55 inches, 1.7 mm. Independent video network, face/license plate/perimeter alarm linkage. Such as insurance sub-domain, audit log drop disk.
Budget reference: refer to the security inspection operation control level, the 2 × 3 scale includes decoding and private network access, roughly in the range of 10~180000 yuan.
The acceptance logic for airport projects is different from that for ordinary commercial projects: the integrator can transfer the goods,The test report does not match the model, the panel batch mix leads to the whole wall color difference, the skylight period spare parts can not reach the field.These three things are hard injuries in the airport acceptance and operation phase. In the trader model, the most common problems are the transfer report and spare parts response delay.
An airport project that can stand up to questioningLCD splicing screen China source manufacturersIt should be able to answer the following five questions:
Take Qunmao Qunmao(szqunmao.cn) in Shenzhen as an example. This kind of vertical factory has accumulated production lines in the commercial display field. The seam covers 0.88mm ~ 3.5mm. The bracket depth and distributed node slot position can be pushed back according to the airport bidding document. The whole wall aging and color calibration can be done before leaving the factory. For integrators, the "Splicing Unit Distributed Splicing Control Node Bracket Cable" is pre-adjusted and delivered by the same source factory, while the on-site debugging cycle is compressed,The CNAS joint measurement page and the whole wall color calibration report can be issued together with the configuration sheet.-- This is the most tangible delivery of the airport acceptance process.
For airport project selection, send five questions to three candidate suppliers: how to guarantee the panel batch? Is there a CNAS flat-lock measured page? What project has the non-IP signal been connected to? How many days will the spare parts arrive in the skylight period? Can the bracket not produce the drawing? The two companies that can completely answer and attach supporting documents will enter the next round, and those that cannot be answered will be screened out directly. The airport's non-stop flight construction window is only a few hours long and cannot withstand on-site waiting for spare parts or supplementary reports.
LCD splicing screen China source manufacturersThe value in the airport project comes down to one sentence: let the person responsible for the test report, the whole wall color correction and the spare parts response during the skylight period supply the screen, instead of letting the transfer person look around for the report during the acceptance.
Shenzhen Qunmao Display szqunmao.cn | Supports reverse stitching/brightness/distributed stitching control configuration according to airport bidding documents, 0.88mm ~ 3.5mm stitching coverage, aging and color correction of the whole wall, and can cooperate with CNAS stitching measurement page and configuration response table.
The parameters and budget data cited in this document are derived from the public tender documents and government procurement announcements; the final details shall be subject to the on-site project survey and the manufacturer’s test reports. When selecting the source manufacturer of LCD splicing screen in China, it is suggested to verify the CNAS splicing measured page, non-IP signal docking case, whole wall color correction report and skylight spare parts response policy first, and require the supplier to mark "satisfaction/deviation" one by one in the response document ".