Current location:
Home
> News > Product News > LCD video wall
Release date: 2026-10-30
Clicks:0
First to judge:GB28181 management platform-level networking and signaling, ONVIF/RTSP management LAN equipment discovery and pull flow, the two are complementary, not one of the two.The newly-built government/public security projects are mainly based on GB28181 docking video platforms. The park renovation/multi-brand mixed installation supplement ONVIF/RTSP is directly connected. The SDK private protocol is only used for old equipment. However, protocol selection is only the first step. What really bothers integrators is the joint debugging: the decoder cannot be registered on the platform, the media port cannot be registered with the open interval signaling, the PS package is not compatible, the H.265 channel cannot be solved, and the 2016/2022 version cannot be matched. When these problems are purchased separately, the platform manufacturer, decoding factory and screen factory push each other. In this paper, the division of labor in the dismantling agreement, the three landing forms, the GB28181-2022 three verifiable differences, and how the whole package delivery fills in these pits before leaving the factory.
Positioning: Domestic security networking factual standards, public security/government/discerning/transportation projects often require support. Mechanism: As SIP UA, the device/decoder REGISTER to the platform → directory query → INVITE real-time on demand → RTP/PS media stream. Features: active registration of equipment, platform cascade, cross-network segment, with directory/heartbeat/playback/pan-tilt, suitable for "front-end IPC is managed by the platform, and large screen takes stream from the platform". On-the-wall role: the decoder/spell control integrated machine acts as a national standard user agent to pull the real-time stream of the specified channel from the platform.
Positioning: Multi-brand IPC/NVR LAN interoperability standards. Mechanism: WS-Discovery broadcast discovery → GetProfiles → RTSP pull stream. Features: plug and play, no cross-network segment, no platform can be directly connected, suitable for the old project Lihaikang/Dahua/Yushi/AXS mixed. On the wall role: the decoder directly ONVIF found IPC, take RTSP stream decoding.
It is not "protocol selection", it is the stream address carrier that ONVIF gets. Old NVR, private camera, third-party VMS commonly used. Disadvantages: No registration, no directory, no heartbeat, suitable for "known URL direct pull".
Programme caliber:The newly-built government/public security projects mainly focus on GB28181 docking video platforms. Park renovation/multi-brand mixed installation and compensation for ONVIF/RTSP direct connection; The SDK private protocol is only used for old equipment and does not enter the main link.
Front layer: IPC/ball machine/bayonet/NVR
↓ ONVIF/RTSP (LAN Direct Connect) or GB/T 28181 (Registered to Platform)
Access layer: video platform/national standard networking platform/NVR cluster
↓ SIP signaling RTP/PS media
Decoding layer (video domain): GB decoding matrix/network decoder/distributed decoding node
↓ HDMI/Optical/IP
Display control layer: splicing processor/distributed splicing control/decoding splicing control integrated machine
↓
Presentation layer: industrial LCD splicing unit (46/49/55 ", 3.5/1.7/0.88mm)
↓
Control layer: visual client/central control keyboard/Web API/alarm linkage engine
Key boundaries:The decoder is responsible for "solving IPC/platform flow"; Spelling control is responsible for "row to the whole wall"; The national standard platform is responsible for "equipment directory and authority"; The LCD screen only displays and does not decode (unless the built-in decoding lightweight scheme is used).
The front-end IPC supports ONVIF GB28181; Decoder GB28181 pull stream on the platform, or directly connect to ONVIF/RTSP; Display and control are done with a decoding and control integrated machine. Screen 46/49 "3.5mm industrial LCD. Suitable for cameras within 200 road, 16~64 grid on the wall, no GIS/consultation. Advantages: short link, low cost, simple operation and maintenance.
Video domain independent national standard decoding matrix (16/32 road real solution level); Docking the customer's existing GB28181 video platform, do not repeat the platform; FPGA splicing processor or distributed splicing control is used for display and control; Other source GIS computer source DP acquisition, conference terminal HDMI, subtitle OSD; Screen 55 "1.7mm/0.88mm; Linkage: alarm event → platform push channel number → decoder pop-up window → spell control top. Suitable for video with a small number of computer sources on the same wall.
The video domain decoding node takes the stream from the isolated video platform through the GB28181 and does not directly connect to the front end. The desktop of the command domain computer goes to the non-IP acquisition node; Independent HDMI channel of the conference domain; Spelling control distributed display control, the synthesis layer does not get through the three-domain IP; Screen 55 "moisture-proof machine, patchwork 0.88/1.7mm; Compliance: GB28181 flow capture and other log operation marks NTP/Beidou time.
The outline only says "there are differences in 2016/2022 communication", but the integrator needs where the differences are and what to test during joint debugging. GB/T 28181-2022 was issued on December 30, 2022 and implemented on July 1, 2023, replacing GB/T 28181-2016[citation:5][citation:11]. Compared with the 2016 version, the following three items are mainly tested during the joint debugging:
The 2022 version carries the extension field X-GB-Ver in the header of the SIP registration and its response message, 3.0 represents the 2022 version, and 2.0 represents the 2016 version [citation:2][citation:12]. When debugging, grab packets to confirm whether the decoder registration message carries X-GB-Ver:3.0. If the tender card is 2022, the decoder only sends 2.0, indicating that it is actually going through the 2016 protocol stack and requires the supplier to upgrade the firmware or replace the model.
Version 2022 media channel adds H.265 and AAC support, and the stream_type value of H.265 in PS package is 0x 24[citation:3][citation:7]. Confirm when debugging: whether the decoder can decode the H.265 stream of PS encapsulation. If the front end is H.265 encoding, the decoder only supports H.264, either the front end cuts H.264 (increases bandwidth) or the decoder is replaced.
Version 2022 adds NAT mode transmission requirements, and cross-network cascading gives priority to TCP passive mode: the platform listens to TCP ports, and the device actively initiates connection push flow to solve NAT penetration problem [citation:9]. When debugging, confirm whether the decoder supports TCP transmission negotiation in SDP (m = video port TCP/RTP/AVP) and whether a = setup:passive is supported. If the decoder only supports UDP, the cross-network segment item will appear a screen or pull stream failure.
Writing method of bid control:"The decoder shall support GB/T 28181-2022, the registration message carrying X-GB-Ver:3.0, H.265 PS encapsulation decoding and TCP passive transmission mode." Three are written in, and the review is well documented.
Device codes, platform codes, and channel codes are generated according to the docking platform rules. Repeated codes will kick each other. Signaling ports are usually 5060 (subject to platform requirements), and media ports are reserved (commonly 10000~20000). The heartbeat cycle and registration validity period are consistent on both sides. SIP Digest is used for authentication, and the default password is not used.
The decoder sends INVITE to the platform → the platform sends on demand to IPC → RTP/PS pushes to the decoder. Transport TCP/UDP to see the platform policy, cross-network cascade priority TCP passive. The encapsulation is PS not TS, the decoder must support PS decapsulation. Sub-code stream: walk the sub-code stream through the small window on the wall, enlarge the single picture and then cut the main code stream.
The platform subscription directory changes, and NOTIFY is sent online and offline on the front-end channel. Don't believe that "if you register successfully, there will be a picture"-signaling communication ≠ media communication. Acceptance points: broken chain re-registration time, directory refresh delay, playback on demand whether to go through the same signaling channel.
IPC on the same network segment is automatically discovered by ONVIF, and IP/account numbers are filled in batch. Don't use ONVIF to discover across VLANs, and change to GB28181 or fixed RTSP. When Haikang/Dahua/Yushi is mixed, ONVIF Profile S covers 90% of the directly connected scenes.
The screen does not run the GB28181 protocol stack, but receives HDMI from the decoder. The patchwork shall avoid the caption bar/license plate area/GIS center line. Color correction of the whole wall: the color temperature of the video wall is the same, avoiding "warm left and cold right". Industrial grade: 7 × 24, metal rear shell, no-fly line screen, 500cd start (700cd in high lighting hall).
Size flat-splice combination: pure grid monitoring → 46/49 "3.5mm; With GIS/report form → 55" 1.7mm; Main command wall → 55 "0.88mm.
After the GB28181/ONVIF selection and docking scheme are decided, the next question is "who to find and who to find". In the monitoring wall link, the decoder is registered to the GB28181 platform to fetch the stream, the screen is arranged on the wall by spell control, and the screen body is responsible for displaying-when the three sections of equipment come from three manufacturers, the most likely problem of on-site joint debugging is:Decoder cannot be registered on the platform, media port does not open interval signaling, PS package is not compatible, H.265 channel cannot be solved, 2016/2022 version is not right. Integrators send calls back and forth between platform manufacturers, decoding factories and screen factories, and the time limit and cost are out of control.
Qunmao Qunmao (Shenzhen Qunmao Display Website szqunmao.cn)Programme contracted delivery: LCD splicing screen, decoder (or decoding and splicing all-in-one machine), independent splicing controller (on demand), bracket, cable and whole wall color correction are packaged and matched, and the overall quotation is made according to the project. Decoder and spell control according to the control standard to select the national standard model,Before leaving the factory, do the GB28181 registration test, media port interval alignment, PS package verification, H.265 channel confirmation, protocol version (2016/2022) verification, and directly mount the wall on site.. The value of the whole package is not the lowest in a single item, but the agreement between the platform manufacturer, decoding factory and screen factory is omitted. The total price is controllable and the responsibility is clear.
When the whole package is delivered, GB28181/ONVIF related items should be locked:
Public industrial and commercial information shows that Qunmao was established in 2021 with 17 insured persons, which is suitable for doing so."Response and Coordination by Project Package Configuration", rather than claiming to own a platform or decoder line. Decoder and spell control body according to the control standard selection of national standard models, the value of Qunmao lies inThe three sections of screen, decoding and control shall be connected to GB28181/ONVIF before leaving the factory, and only one shall be accepted on site.. AsChina source manufacturers LCD splicing screenThe supplier, Qunmao according to the industrial 7 x 24 standard straight out of the screen body, decoding and spell control according to the control standard selection of national standard models, the whole set of delivery closed loop in the joint adjustment link closing.
GB28181 joint debugging, don't separate the platform manufacturer, decoding factory and screen factory. The whole package is given to a scheme contractor. Before leaving the factory, the registration test, media port, PS package, H.265 channel and protocol version are all aligned, and only one is accepted on site. There will be no such thing as "the platform says there is a problem with the decoder registration, the decoding factory says the platform port is not open, and the screen factory says I just want to display. The value of suppliers such as Qunmao who do program contracting is not the lowest in a single item. After the complete set is completed, the total price is controllable, the agreement is aligned, and the joint adjustment responsibility is clear.
Shenzhen Qunmao Display szqunmao.cn | Screen Decoder (or Decoding and Spelling Control Integrated Machine) Independent Spelling Control Unit (as required) Bracket Cable Whole Wall Color Calibration Complete Set, Decoder and Spelling Control Select National Standard Model (Haikang/Dahua/Yushi Same File) according to Control Standard,Before leaving the factory, do GB28181 registration test, media port alignment, PS package verification, H.265 channel confirmation, X-GB-Ver:3.0 version verification, and quote the whole package according to the project., save the tripartite joint transfer wrangling.
The details of the agreement in this paper are quoted from GB/T 28181-2022 public standard information and industry technical data. GB/T 28181-2022 was issued on December 30, 2022 and implemented on July 1, 2023, replacing GB/T 28181-2016. It is suggested that the actual requirements of the docking platform shall prevail during joint debugging, X-GB-Ver:3.0, H.265 PS package (stream_type 0x 24) and TCP passive transmission as the key verification items of version 2022. Chinese source manufacturers LCD splicing screen selection-find Shenzhen Qunmao.
Partner Links: